Basement Finishing &

Renovation

Many homes throughout McHenry, Lake, Kane, and Walworth counties have basement space that rarely gets used to its full potential. Basement finishing can turn that empty lower level into a functional part of your home, whether you want a comfortable media room, a dedicated workout area, or extra bedrooms.

With more than 25 years of experience, Scheibe Construction manages basement projects.


 From unfinished concrete to completed living space, coordinating the design, permits, and construction along the way.

Option 01

Slab Up / Unfinished Basement


Starting with an unfinished basement gives you the most flexibility, but it also means more decisions to make. From framing and insulation to electrical, plumbing, and finishes, everything gets built new, which means the finished layout can be designed entirely around how you want to use the space.

Design Your Unfinished Basement 

An unfinished basement gives you a lot of flexibility to create the space you actually need. We begin by discussing how you plan to use the area, then develop a design that considers existing mechanical systems, ceiling height, moisture protection, and required egress before any construction starts. The result is a finished basement that feels intentional and connected to the rest of your home rather than like a separate space added downstairs.

Permits, Drawings & Layouts | We Handle the Details 

Finishing a basement involves more code requirements than most homeowners expect: egress windows for bedrooms, proper insulation, electrical to code, and permits for the work itself. We handle the drawings, permit applications, and inspections required to finish the space legally and safely, so you're not left navigating county requirements on your own.

Movie Theaters, Gyms, Wellness Spaces, Bars, Game Rooms, Bathrooms & Bedrooms

An unfinished basement can become almost any room your home is missing. We've built out dedicated movie theaters, home gyms, wellness spaces, bars, game rooms, and full bathrooms and bedrooms, each planned around the specific plumbing, electrical, and ventilation its function requires. If you have a specific vision for the space, we'll help you figure out what it takes to build it.

Complete 50% renovation of property

For basements that are partially finished with outdated materials or a layout that no longer works, we can renovate the space in phases, updating one section at a time, updating finishes and, where needed, reworking the layout, while keeping the rest of the basement functional during construction.

If you're ready to see what your basement could become, contact us at Scheibe Construction for a free consultation.

Partial Basement Renovation


Your basement doesn't have to be completely finished or rebuilt in a single project. A basement renovation can focus on the areas that need the most attention, from refreshing worn finishes to creating additional usable space. Taking a phased approach can be a smart choice when you're balancing the project's cost and timeline or when the existing condition of the basement makes a full buildout unnecessary right away.

Redo flooring


If your basement is already finished but the flooring has aged out or suffered water damage, we replace it with materials suited to below-grade conditions, including moisture-resistant options that hold up better than standard flooring in a basement environment. 

OUR WORK PROCESS

Our Proven Process

A three-phase approach that keeps your project on track from concept to completion.


PLAN

We start with an in-depth consultation to understand your vision, budget and timeline, then create a detailed plan together.


DEVELOP

We develop project specifications, secure the necessary permits, and coordinate materials and schedules.


EXECUTE

We build your project with precision and care, with daily updates and quality inspections through to delivery.

TIMELINE ROADMAP

How Long Does a Kitchen Remodel Take?

A full kitchen remodel takes around 3 months from the day the contract is signed. Here is your step-by-step process.

STEP 01 📝

Contract Signed

Design is final, measurements verified, and custom cabinets are officially ordered.

ABOUT 2 MONTHS 📦

Cabinets Built & Delivered

Precision ordering, custom building, quality check, and safe delivery of your cabinets.

ABOUT 1 MONTH 🛠️

Demo & Installation

Old kitchen removal, plumbing/electrical prep, countertop fitting, and final cabinet installation.

TOTAL ESTIMATE ⏱️

Around 3 Months

Full end-to-end transformation. Partial remodels take significantly less time depending on project scope.

YOUR QUESTIONS, ANSWERED

Frequently Asked Questions


How long does a typical remodeling project take?

Kitchens, to order, build, and delivery of cabinets takes around 2 months. Demo of old and installation of new take around another month. around 3 months from when the contract is signed.

  • Master Bathroom is about a month.
  • Normal bathroom is around 2 weeks.
Do you offer free estimates?

Yes, we provide complimentary consultations and detailed estimates for all projects. We’ll assess your space, discuss your goals, and deliver a transparent breakdown of costs and timelines.

Are you licensed and insured?

Absolutely. Scheibe Construction is fully licensed, bonded, and insured. We carry comprehensive liability and workers’ compensation coverage, ensuring complete protection for you and our team throughout your project.

Can you help with design and planning?

We work closely with designers and architects to bring your vision to life.

More remodeling services

Planning More Than a Kitchen?


Bathroom

Remodels

Full and light bathroom renovations.

Basement

Finishing

Finish an unfinished basement or update part of it.

Whole-Home Remodels

General contracting and custom design work.

Custom

Carpentry

Built into every renovation project.

Home

Additions

Sunrooms, three- and four-season rooms, bedrooms and garages.

Scroll to Top